Following a national design competition, Adidas selected Thomas Robinson of LEVER Architecture, together with Studio O+A and Gustafson Guthrie Nichol (GGN), to realize a major expansion of their North American Headquarters.

For its innovative and sustainable design, Adidas North American Headquarters has recently been awarded a 2023 Green Good Design Award and a 2022 American Architecture Award by The Chicago Athenaeum: Museum of Architecture and Design and The European Centre for Architecture Art Design and Urban Studies.
The target LEED Gold project enhances Adidas’ Portland, Oregon campus with a new arrival sequence and two signature buildings.
The placement of the two buildings around a new central sports plaza transforms the existing plaza into a more cohesive campus landscape, strengthens connectivity internally between the existing buildings, and alters the landscape connections to the adjoining residential neighborhood.

The project is inspired by the dynamism of small stadium environments where spectators and players engage in an active dialogue.
The architecture of the two buildings connects creative work, community, and sport.
The program for the 182,000-square-foot office building includes a food hall, coffee bar, maker and creative labs, meeting zone, and four levels of open workspace.
The 31,000-square-foot athletic center is intended to serve as a campus destination for athletic training and community events.
Both buildings cantilever over the soccer field, emphasizing views of formal and pick-up matches.
On the ground level, the buildings open directly onto the field, integrating diverse public spaces from café seating to places for outdoor training.

The overall material palette for both buildings is raw and authentic: exposed concrete, wood, and metal panels that are woven across the façade.
Creating a changing play of light and shadow depending on the time of day, the custom metal panels on the office building façade mimic how Adidas uses materials in specific ways to create a dynamic appearance with their product designs.
Leveraging the firm’s expertise with timber innovation, the design for the Office Building deploys a unique hybrid structural system made from pre-cast concrete columns and girders with glulam beams and Cross-Laminated Timber (CLT) panels.
The Athletic Center’s all-mass timber design includes glulam columns and beams with CLT panels.

Located over an existing parking garage, the design takes advantage of the lightness of wood to create a larger structure.
Mass timber’s warm character, technical innovation, and connection to the regional forestry culture make it an ideal material for a cutting-edge brand with roots in the Northwest.
Campus planning upgrades are a critical part of the expansion.
The master plan establishes a new intersection and entry point to the campus that terminates at an arrival court and drop-off area.
Surrounded by existing and new architecture, the courtyard serves as a powerful space of arrival for visitors.






Project: Adidas North American Headquarters
Architects: LEVER Architecture
Lead Architect: Thomas Robinson
Associate Architects: Studio O+A (Interior Architect)
Landscape Architects: Gustafson Guthrie Nichol (GGN)
General Contractor: Turner Construction Company
Client: Adidas North America
Photographers: Jeremy Bittermann and Garrett Rowland













